All sections free during launch

Forget this device?

You’ll need your email again to copy code here. Your email and newsletter settings stay as they are.

Collection

Collection Trail

A collection becomes a walk. While visitors scroll, the products travel along a curved trail, small and soft on the way in, sharp and big at the stop. The one at the stop shows its name, price, options and add to cart in a calm dock beside it, then moves on for the next. Snap or one product per scroll, three trail shapes, and a plain row for visitors who prefer less motion.

Access
Free
Page types
Home, Collection, Landing pages
Compatibility
All Shopify 2.0 themes*
Styles
1
Customise
52 settings · 1 block type
  • Collection
  • Scroll
  • Path
  • Motion
  • Add to cart
  • Options

Installation

Takes about two minutes. No app needed.

  1. 01

    Create a new section

    In your theme code editor (Online Store → ⋯ → Edit code), click the sections folder, then “New File”, name it and hit Enter.

  2. 02

    Paste the code

    In the file that just opened, paste the code below. Then hit Save (top right corner).

    Note: Shopify shows no confirmation when a section saves – that’s normal.

  3. 03

    Add it in the theme editor

    Saved? Then reload the theme editor – otherwise the new section sometimes doesn’t show up. After that: Edit theme → Add section → . Everything else is in the sidebar – the Docs below explain every setting.

Code

One file. Copy it, paste it, done.

sections/werk-collection-trail.liquid

Locked

2943 lines · Liquid, CSS & vanilla JS

Free – just add your email

Every section is free during launch. Enter your email once and copy any code you like.

More like this

Docs

Every setting, what it does and where you see it. All in the theme editor, no code.

Home or collection pageOne look2 to 24 products3 trail shapesOptions and add to cart

What you can change

Every numbered spot has its own chapter below.

13 chapters

* Built for Online Store 2.0 and tested in Shopify's Horizon and Dawn themes. Heavily customised or older themes can still clash with it – if something looks off, write us and we'll take a look.

Live preview

Copied. Now paste it into Shopify.

Takes about two minutes. No app needed.

  1. 01

    Create a new section file

    In Shopify: Online Store → ⋯ → Edit code. Click the sections folder, then “New File”, name it and hit Enter:

    werk-collection-trail.liquid
  2. 02

    Paste the code and save

    In the file that just opened, paste the code:

    {%- comment -%} werk · Collection Trail · v1.3.0 · werk.build/license – do not remove {%- endcomment -%}

    Then hit Save (top right corner).

    Note: Shopify shows no confirmation when a section saves – that’s normal.

  3. 03

    Add it in the theme editor

    Saved? Then reload the theme editor – otherwise the new section sometimes doesn’t show up. After that: Add section → search “Collection Trail”. Done.

Your browser blocked copying.

No worries – the code is selected below. Press ⌘ C (Ctrl C on Windows) and you’re good.

⌘C